Underground power cable is much expensive and time consuming than overhead line. Therefore, it is possible to reduce the time and cost assigned to laying power conduits out and duct rodding test, using direct-buried cable without any protective materials. Because the direct-buried cable is exposed to backfill soils, the backfill soils have to secure enough bearing power and thermal dissipation capability for the cable stability. Thus, for convenient compaction control on fields, the cone penetration device and thermal probe were manufactured. Then, the laboratory experiments were conducted using these devices, and found the correlations between soil thermal conductivity, relative compaction, and normalized cone tip resistance. And the large-scale loading tests describing construction fields were conducted using real direct-buried cable. With those results, compared to field test, the construction standard for direct-buried cable such as burial depth and compaction methods was proposed. Based on this study, it is possible to conduct backfill and compaction step for underground power cable, and to achieve stable and practical use of direct-buried cable.
전력 케이블 지중화 시공은 기존의 가공선로에 비해 공사 비용과 시간이 많이 소요되는 약점을 지닌다. 따라서 보호관로 없이 케이블을 직접 매설하는 직매공법을 활용하여 관로 포설, 도통시험 등에 소요되는 시간과 비용을 절감하고자 한다. 직매 케이블은 주변 되메움토에 직접 노출되어 있으므로 케이블의 안정성을 위하여 주변 되메움토는 충분한 지지력과 열방산능력을 확보하여야 한다. 따라서 현장에서 손쉽게 다짐관리를 수행할 수 있도록 콘 관입장비와 열 탐침을 제작하였고, 실내 실험을 통해 흙의 열전도도와 상대 다짐, 그리고 상재하중에 대해 정규화된 콘 관입저항간의 상관관계를 파악하였다. 그리고 직매 케이블을 사용하여 하중재하실험을 수행하였고, 그 결과를 현장실증시험 결과와 비교하여 직매공법의 케이블 매설 깊이와 다짐 방법 및 다짐도 규정을 제안하였다. 본 연구를 통해 효과적으로 지중 케이블 되메움 및 다짐관리를 수행할 수 있으며, 직매공법을 안정적으로 적용할 수 있을 것으로 판단된다.