서지주요정보
클러스터장비의 전이기간 스케줄링 = Transient scheduling for cluster tools
서명 / 저자 클러스터장비의 전이기간 스케줄링 = Transient scheduling for cluster tools / 김태규.
발행사항 [대전 : 한국과학기술원, 2003].
Online Access 원문보기 원문인쇄

소장정보

등록번호

8013950

소장위치/청구기호

학술문화관(문화관) 보존서고

MIE 03008

휴대폰 전송

도서상태

이용가능(대출불가)

사유안내

반납예정일

리뷰정보

초록정보

Cluster tools that integrate several single wafer processing modules with a wafer handling robot have been increasingly used for semiconductor manufacturing. Scheduling steady state operation of a cluster tool has been widely studied. We examine the scheduling problems for transient periods of cluster tool operation, start-up and close-down. The transient periods and wafer residency times within processing chambers should be minimized. We prove that for a given steady state schedule, the earliest starting policy that starts each operation as soon as the preceding operations complete is optimal for the close-down period. We also show that by a kind of duality relationship, the lastest starting policy is optimal for the start-up period. We also suggest a way of improving the steady state schedule so that the total makespan is minimized.

서지기타정보

서지기타정보
청구기호 {MIE 03008
형태사항 [iii], 42 p. : 삽화 ; 26 cm
언어 한국어
일반주기 저자명의 영문표기 : Tae-Kyu Kim
지도교수의 한글표기 : 이태억
지도교수의 영문표기 : Tae-Eog Lee
학위논문 학위논문(석사) - 한국과학기술원 : 산업공학과,
서지주기 참고문헌 : p. 41-42
QR CODE

책소개

전체보기

목차

전체보기

이 주제의 인기대출도서