제품 개발 기간 단축을 위한 프로세스 룰 및 적용 절차에 관한 연구 = A study on process rules and their implementation for the reduction of product development lead time
서명 / 저자 제품 개발 기간 단축을 위한 프로세스 룰 및 적용 절차에 관한 연구 = A study on process rules and their implementation for the reduction of product development lead time / 손형률.
발행사항 [대전 : 한국과학기술원, 1998].
Online Access 원문보기 원문인쇄

소장정보

등록번호

8008677

소장위치/청구기호

학술문화관(문화관) 보존서고

MIE 98011

휴대폰 전송

도서상태

이용가능(대출불가)

사유안내

반납예정일

등록번호

9004418

소장위치/청구기호

서울 학위논문 서가

MIE 98011 c. 2

휴대폰 전송

도서상태

이용가능(대출불가)

사유안내

반납예정일

리뷰정보

초록정보

Due to ever changing customers' tastes, competitive environment in the market and advanced technologies, new philosophy was introduced to give solution to current manufacturing area; That is concurrent engineering. Concurrent engineering is a systematic approach to the integrated concurrent design of products and their related processes, including manufacture and support. The duration of product design is critical when a company releases a product to the market at the right time to gain advantage over competitors. So reducing product development lead-time to satisfy customer's ever changing tastes in timely manner is a very pressing and challenging task for the survival and growth of the companies. Duration of product development is dependent on the sequence of the processes and duration of each process. In this paper, we concentrate on the duration reduction of design process by using business process re-engineering(BPR) techniques and information technology. At the heading, design process is described briefly. Conceptual classification of design process is proposed. Six BPR Rules(Make activities concurrent, combine serial activities, eliminate the redundant activities, partition activities, Shorten the duration of activities, reallocate the activity) are provided and their application procedure is developed with the cost-benefit analysis for the reduction of duration. The proposed approach provides the basis for the structured BPR on the design process and quantitative evaluation of the project duration. Results of the computational experiments based on real field data shows the proposed formulation is reasonably accepted.

서지기타정보

서지기타정보
청구기호 {MIE 98011
형태사항 v, 66 p. : 삽화 ; 26 cm
언어 한국어
일반주기 부록 : A, AS-IS 제품 개발 프로세스 DFD(1/4). - B, TO-BE 제품 개발 프로세스 DEF(1/2). - C, AS-IS Gantt chart. - D, TO-BE Gantt chart, Approach 1: 예산이 무한할 때. - E, TO-BE Gantt chart, Approach 2: 예산이 유한할 때. - F, TO-BE Gantt chart, Approach 3: 목적식 이용
저자명의 영문표기 : Hyoung-Ryul Sohn
지도교수의 한글표기 : 서효원
지도교수의 영문표기 : Hyo-Won Suh
학위논문 학위논문(석사) - 한국과학기술원 : 산업공학과,
서지주기 참고문헌 : p. 54-56
QR CODE

책소개

전체보기

목차

전체보기

이 주제의 인기대출도서