건설공정에서의 현금흐름할인을 고려한 자원제약 프로젝트의 스케줄링에 관한 연구 = Exchange heuristic procedure for the resource constrained project scheduling problem with discounted cash flows in construction
서명 / 저자 건설공정에서의 현금흐름할인을 고려한 자원제약 프로젝트의 스케줄링에 관한 연구 = Exchange heuristic procedure for the resource constrained project scheduling problem with discounted cash flows in construction / 이소민.
발행사항 [대전 : 한국과학기술원, 2006].
Online Access 원문보기 원문인쇄

소장정보

등록번호

8017267

소장위치/청구기호

학술문화관(문화관) 보존서고

MIE 06003

휴대폰 전송

도서상태

이용가능(대출불가)

사유안내

반납예정일

리뷰정보

초록정보

In this study, the real scheduling problem of a construction company is considered. And the problem is recognized as the Resource Constrained Project Scheduling Problem with Discounted Cash Flows (RCPSPDC). This problem involves scheduling the project activities with cash inflows and outflows, in such a way the net present value of the cash flows is maximized subject to resource and precedence constraints. The modified EH procedure was proposed as a heuristic solution technique for this problem. This procedure improves the net present value by moving the activities with positive cash flow to the left and negative cash flow to the right. In this problem, it is not important to minimize the makespan. The effectiveness of the proposed heuristic rule is evaluated by comparing it with the solution of real company’s method. And we also compare it with 1300 different feasible solutions generated randomly. EH algorithm successfully produced near-optimal solutions with reasonable computational effort.

서지기타정보

서지기타정보
청구기호 {MIE 06003
형태사항 iv, 42 p. : 삽화 ; 26 cm
언어 한국어
일반주기 저자명의 영문표기 : So-Min Lee
지도교수의 한글표기 : 양태용
지도교수의 영문표기 : Tae-Yong Yang
학위논문 학위논문(석사) - 한국과학기술원 : 산업공학과,
서지주기 참고문헌 : p. 38-40